07

MUSAED AL‑JOHANI · SINCE 1396H

Quality

An integrated quality system spanning materials, mix design, laboratory and field verification.

01CHAIN OF CUSTODY

FROM SOURCE TO SITE

Quality is not a final inspection. It is a record that begins before the mix.

The verification system connects material selection, mix design, production control and field testing in one traceable path.

01MATERIALSSOURCE
02MIX DESIGNDESIGN
03PRODUCTIONCONTROL
04SITEVERIFY
04CONNECTED STAGES
02DOCUMENTED EVIDENCE

CERTIFICATIONS & CONFORMANCE

A standard stops being a promise when it carries a number, reference and date.

Authentic records extracted from the company profile and enhanced for clear web presentation while preserving the documents.

012026 / 2029

SASO 2026

SAUDI QUALITY MARK

Quality-mark license for ready-mixed concrete under SASO-ASTM-C94M:2024.

02PLANT A

NRMCA / A

PRODUCTION FACILITY CONFORMANCE

Conformance certificate for automated central mixing at the Madinah Plant A production facility.

03PLANT B

NRMCA / B

PRODUCTION FACILITY CONFORMANCE

Independent production-facility conformance for Madinah Plant B within the documented quality record.

01 / 03DOCUMENTED EVIDENCE
01

CERTIFICATE & CONFORMANCE

03HOW THE SYSTEM WORKS

FOUR CONTROL POINTS

Every stage hands evidence to the next.

VERIFIED INPUTS01 / 04

MATERIALS

Aggregate, cement, water and admixture sources are reviewed before entering production.

EVIDENCE HANDED FORWARD
PERFORMANCE ENGINEERING02 / 04

MIX DESIGN

Proportions are set against strength, workability, project requirements and the governing standard.

EVIDENCE HANDED FORWARD
BATCH RECORD03 / 04

PRODUCTION

Batching calibration and production records connect every result to its source and time.

EVIDENCE HANDED FORWARD
FIELD EVIDENCE04 / 04

SITE

Field verification and strength testing close the loop from plant to built element.

EVIDENCE HANDED FORWARD
04 / NEXT STEPQUALITY FILE AVAILABLE

BEFORE SUPPLY

Request the evidence your team needs before the first batch arrives.

Share the project specification and approval requirements so the right quality path and records are prepared from the start.

START HEREREQUEST THE QUALITY FILE01QUALITY DESK< 24 H